Hydro > Status
Hydro Power Plants
Section/ Unit |
Hwa cheon |
Chun cheon |
Uiam | Cheong pyeong |
Pal dang |
Chilbo | Boseong gang |
Goesan | Gang rim |
Gang neung |
---|---|---|---|---|---|---|---|---|---|---|
Capacity (MW) |
108 | 62.28 | 48 | 140.1 | 120 | 35.4 | 4.5 | 2.8 | 0.48 | 82 |
Generator (Unit) |
4 | 2 | 2 | 4 | 4 | 3 | 2 | 2 | 3 | 2 |
Total storage |
1,018 | 150 | 80 | 185.5 | 244 | 466 | 5.7 | 15.3 | 0.07 | 51.4 |
Year of Completion | 1944 | 1965 | 1967 | 1943 (2011) |
1972 | 1945 (1965) |
1937 | 1957 | 1978 | 1990 |
Total : 28 Units / 603.56MW
Facility Extension Improvement Status
Date of completion | Facility extension / improvement status |
---|---|
Jun, 2014 | Performance improvement work for Cheongpyeong Hydropower Plant (#2) |
May, 2014 | Performance improvement work for Cheongpyeong Hydropower Plant (#1) |
Oct, 2013 | Performance improvement work for Cheongpyeong Hydropower Plant (#3) |
Jul, 2013 | Performance improvement work for Euiam Hydropower Plant (#2) |
Jul, 2012 | Performance improvement work for Goesan Hydropower Plant (#1, 2) |
Jun, 2012 | Performance improvement work for Euiam Hydropower Plant (#1) |
Dec, 2011 | Extension of Cheongpyeong Hydropower Plant (#4) |
Jun, 2009 | Performance improvement work for Chuncheon Hydropower Plant (#1) |
Jun, 2008 | Performance improvement work for Chuncheon Hydropower Plant (#2) |
May, 2003 | Extension of capacity of Anheung Hydropower Plant (#1, 2, 3) |
Jun, 1999 | Extension of capacity of Paldang Hydropower Plant (#1, 2) |
Sep, 1997 | Extension of capacity of Paldang Hydropower Plant (#3, 4) |
May, 1990 | Extension of capacity of Boseonggang Hydropower Plant (#1, 2) |
Characteristics and Mission of Hangang Hydropower Plant
- Contributes to maximization of economic feasibility of electricity generation through optimized use of water resource.
- As a water resource, supplies water, controls flood, and manages environment of river basin.
- Transfers technology to small businesses, solves technical problems and develops new products via joint research.
- Manages large riverside and workplaces across 5 Dos and 14 Sis/Guns.
- Area of management: 20.6 million ㎡ (50% of the entire lands of the company ? 5 Dos, 14 Sis/Guns and 38 Eups/Myeons)
- Length of the stream : 187km (39% of the total length of the Hangang River)
Operation of Dams on the Hangang River Water System
- Operation policy: To maximize utilization of water resource and flood control capability.
- Dry season: To secure water for generation and living by maintaining high water level (peak power)
- Right before the flood season: To extend the flood control capability by maintaining low water level
- Flood season: To control flood based on the restricted water level of each dam (base load)
Flood season: The potential flood damage period (Jun. 21 ~ Sep. 20)
- Cooperation with relevant agencies in relation with management of water resources
- Cooperation for operation of water system and control of flood <Han River Flood Control Office of Ministry of Land, Infrastructure and Transport>
- 3 staffs dispatched during the flood period <Central Disaster and Safety Countermeasures Headquarters>
Operation of Dams with Power And Reservoir Operating System (PAROS)
Facility
- Hydropower Control Center: 1 unit of PAROS
- Power plant: Distributed Control System (DCS), Remote Terminal Unit (RTU) and remote supervision system
Function
- Link with the data of EMS, Han River Flood Control Office, Korea Water Resources Corporation, Korea Institute of Civil Engineering and Building Technology.
- Acquire/process the floodgate data and maintain the record automatically.
Floodgate data, such as water level, discharge flow, water consumption, etc. / generation data, such as gross generation, voltage, current, etc. / meteorological data, such as amount of rainfall